Our Construction Project Execution History with Locations and Dates.

Title: Site Construction Contract

Brief Description: The project covers structure renovation work, technical and logical revival of the entire external look building.

Site Location: Victoria Garden City Ajah

Construction Start Date: Nov. 2014 - construction completion date; Dec.2014

Contracting Authority: Mr. Emmanuel Uzokwe

Site Kraft Role in Project delivery: Main Contractor

 

Title: Site Construction Contract

Brief Description: A blend of unique ideas with specially selected material with distinctive art combined in the creation /construction of AVAMTCOP block of flat.

The structure contains apartments of 2, 3, and 4bedroom flats and BOS/car parking, designed with distinguished skills and ability.

Site Location: Prince Alaba Oniru

Construction Start date: November 2010  - Construction completion date: July 2012.

Contracting Authority: Savant

Site Kraft Role in project delivery: Project Engineer

 

Title: Site Construction Contract

Brief Description: An (MDG) sponsored project with the Lagos government.

The Primary Health care facility is located in Ebute Meta.

The construction was carried out by Site Kraft consult with the best of tools and well-trained skilled personnel.

Site Location: Ebutemeta Lagos

Construction Start date: April 2011 - Construction completion date: July 2011

Contracting Authority: Molisco Nig. LTD

Site Kraft Role in Project delivery:  Main contractor

 

Title: Site Construction Contract

Brief Description: External beautification work (interlock) and landscaping

Site Location:  Victoria Garden City Ajah

Construction Start date:   Jan 2015  - Construction completion date: Feb 2015

Contracting Authority: Mr.Niyi Adeseun

Site Kraft Role in project delivery:  Main contractor

 

Title: Site Construction Contract

Brief Description: Laundromat, Pump House, Generator House, Refuse House, GateHouse, and Perimeter Fencing.

Site Location: Lagos Homes Lekki Scheme 1 (lkate Roundabout) Lekki, Lagos.

Construction Start Date: Feb 2015 - Construction completion date: Ongoing

Contracting Authority:  WABU Adeola & Sons Ltd (LSDPC)

Site Kraft Role in project delivery:  Project Sub Contractor

 

Title: Site Construction Contract

Brief Description: Looking like a French provincial castle, this structure recalls the grandeur of an era of grace and charm. Nothing is left to chance in the elegant floor plan.

A spectacular entry reveals a double step with a columned gallery, majestic spacing in the living room, and bedrooms with sizeable windows and doors.

All centered with a well-finished kitchen area with a class of granite top and an island.

Site Kraft Technical ability cannot be underrated because we design and build exotic luxury from experience.

Site Location: Chariton Gate Estate, Chevron

Construction Start Date:  Nov 2012 - Construction Completion date: July 2013

Contracting Authority:  Mr. Folarin

Site Kraft Role in Project delivery: Main Contractor

 

Title: Site Construction Contract

Brief Description: Eclectic character personified, the luxury structure is embellished with ornamental stone. Flanking the two-story foyer is open to the living area and formal dining.

But not merely another striking traditional face of design, this concept brings the best in the liveability to its immense proportions.

The massive living room is large enough for the most extravagant interior design. The master’s quarters have an attached sitting room, dressing area, vaulted bath.

Four upstairs bedrooms have private baths and walk-in closets with abundant storage are prevalent throughout.

Site Location: Victoria Garden City Ajah

Construction Start Date: Nov. 2012 - Construction completion date: Feb 2014

Site Kraft Role in project delivery: Main Contractor  

 

Title: Site Construction Contract

Site Location:  Ibadan

Construction Start Date:   Construction completion date

Site Kraft Role in Project delivery: Design /Main Contractor

 

Title: Site Construction Contract

Brief Description: The construction work covers a 346.23sqm factory building, strategically located on plots of land with office and showroom space at the front.

The design is so unique with special provisions for staff quarters, power, and diesel house.

Site Location: Igando along Lekki Epe Express Road

Construction Start Date: March 2010 Construction - completion date: June 2012

Contracting Authority: Chibok Nig. Ltd

Site Kraft Role in Project delivery: Main contractor

 

Title: Site Construction Contract

Brief Description: A blend of unique facades with an exotic finish. The design concept covers a moderate concept office and sizeable showroom. Design and construction material were specially selected from classic brands.

Site Location: Awolowo Road lkoyi, Lagos.

Construction Start Date: Oct 2014 - Construction completion date: Nov. 2014

Contracting Authority: Blue Tech Logistics and Solution

Site Kraft Role in project delivery: Main contractor

 

Title: Site Construction Contract

Brief Description: Georgian design is the byword of this concept. It speaks of aristocracy and high society. And yet, it is overstated or trite.

This very formal Georgian was designed to be admired, but also lived in it features handsome formal areas in a living room and formal dining room, but also an oversized family room with local terrace.

The master suite is on there are four bedrooms with great closet space with abundant space for car parking.

Site Location: Shangotedo, Ajah

Construction Start Date: Feb 2013  - Construction completion date: July 2013

Contracting Authority: Mr. Sam Oshepa

Site Kraft Role in Project delivery:  Designer/Main Contractor

 

 

Address: Plot 4/6, Road 10 Okusiye Idafa via Maya, Ikorodu, Lagos State, Nigeria.

Telephone: 09066066669

 